PLC Control System Sourcing: One Boiler Order, Two Mistakes, and the Checklist I Wish I'd Had
A first-person account of two costly PLC sourcing mistakes on industrial boiler automation projects — what I got wrong, what the spec sheet actually needed, and the pre-check list our team now runs before every PO.